Vaden 200 yard/hour gold recovery plant located 40 miles from Sacramento, California on the Yuba River.
A six man operation. The ore body was mined by Paul Vaden and partners.
|
Click Image For Larger Version |
Vaden 200 yard/hour gold recovery plant located 40 miles from Sacramento, California on the Yuba River.
A six man operation. The ore body was mined by Paul Vaden and partners.
|
Click Image For Larger Version |
Blasting of the ore body. |
Click Image For Larger Version |
Picture shows ore body that was 120’ high and a quarter of a mile wide.
Notice the cleanness of the gravel. This operation also used the gravel as a by-product.
|
Click Image For Larger Version |
Picture shows the simplicity in the gold recovery system using jigs and centrifugal separators.
All the gold recovered in this operation was micro gold.
The gold ran $4/yard.
|
Click Image For Larger Version |
Shows full operation.
Please note 50’ hydro cyclone tower at the top right of the picture and one of the (3) settling ponds.
|
Click Image For Larger Version |
Another picture of the recovery system.
Recovery system consists of:
Boil box, slick plate, six foot scalper sluice box, (4) large custom made jigs, centrifugal separators, and a nine by forty foot smart sluice box.
Sluice boxes were used as a secondary backup in case the jigs failed.
|